43 Vine Street

SCORE: 51% 

DISPOSITION: Does Not Align With the Master Plan

 

View the Executive Summary

View the Project Narrative

View the DRP Presentation

 

March 2018 - Submitted to the DRP

  • Proposed a 70-space flat surface private parking lot with landscaping to service the tenants of the MedTech Building located in Uptown.
  • Seeking a local artist to use the lot as a canvas.
  • Project includes the demolition of existing buildings on site.
  • Seeking zoning variance.

 

April 2018 - Sat before the DRP

  • The DRP determined the project was not in alignment and scored the project a 51%.
  • Offered to work with community orgs to create a more comprehensive developmen in alignment with the Master Plan.
  • Developer declined.
  • Therefore the project was not advanced.

 

 

 